Specifications include, but are not limited to: the construction of Water, Sewer, Storm, and Street Improvement District No. 2023-4 (64th Ave from CR17 to 66th St); consisting of sanitary sewer mains, watermain, storm sewer, edge drain, PCC pavement streets, concrete curb and gutter, sidewalk / shared-use path, signage, seeding, tree plantings, lighting, detectable warning panels and other miscellaneous items. The project will consist of the following items: 8,266 CY Unclassified Excavation 35,757 CY Borrow Excavation 10.30 ACRE Seeding and Hydro Mulch 4,311 CY Aggregate Base Course Class 5 11,504 SY 10IN Non-Reinforced Concrete Pavement Class AE Doweled 6,964 SY Sidewalk Concrete 6IN Reinforced-Fiber 714 TON FAA 43 Hot Bituminous Pavement 3,698 LF Concrete Storm Sewer Various Sizes 5,457 LF PVC Sanitary Sewer Various Sizes 588 LF PVC C900 Watermain Various Sizes 7,827 LF Curb & Gutter Street Lighting System Traffic Control and all miscellaneous work necessary therefor and incidental thereto.