Specifications include, but are not limited to: The intent and purpose of the Invitation for Bid is to establish a firm fixed price for all labor, materials and equipment necessary to furnish and install new clamp-on ultrasonic flow meters at existing wastewater pump stations throughout the Town. This project shall include, but not be limited to, the contractor becoming familiar with all the sites and the current and projected operating parameters of the lift stations, and installation of a complete and usable flow monitoring system as stipulated per the Scope of Work, General Terms and Conditions and Special Terms and Conditions. This project generally consists of the following: • Reviewing and evaluating the system for full understanding of what is expected. • Meeting with Derry Wastewater Division staff to get their input on the daily operations of the system. • Furnishing & installing new clamp-on ultrasonic flow meters at designated locations within the existing sewer lift station drywell. • Connecting low meter output to existing SCADA system. • Connecting unit to existing electrical power supply. • Calibrating units per manufacturer’s specifications. • Training Town staff on the operation and maintenance of new flow meters.