Specifications include, but are not limited to: Project consists of the renovation and paving of approximately 7,488 SY of Organizational and Non-Organizational parking at the Westbrook Armory located at 120 Stroudwater Street, Westbrook, Maine. This includes approximately 847 SY of 8" thick concrete pavement with an Alternate Bid Item expanding the 8" concrete pavement to a total of 3,099 SY. Project requirements also include the removal of approximately 7660 CY of existing gravel parking; emplacement of 223 SY of concrete pads and aprons, 226 LF of concrete curb; the demolition of the abandoned metal storage building (1,800 sf) and slab, the replacement of existing fencing and gates, installation of storm water drainage and exterior lighting. Project will be executed in two phases with the earthwork phase completed no later than 1 October 2024 and the paving phase no later than 31 July 2025. All work to be executed in accordance with plans and specifications developed by Colby Company Engineering, dated 24 May 2024.