Specifications include, but are not limited to: Soil Remediation - Group #521: City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications. 13. All repairs must meet the Rehabilitation Specifications of the City Planning Dept. and MUST BE COMPLETED WITHIN 2 WEEKS OF COMPLETING THE PROJECT. FENCES MUST BE REINSTALLED WITHIN ONE WEEK. 14. At all times, keep the work-site and surrounding area(s) free from accumulations of waste materials or rubbish caused by the work. 15. Install erosion control devices to control soil displacement as necessary. 16. Replace all downspout extensions in Drip Zones at the end of each work day. 17. Refrain from utilizing neighboring properties for any reason unless granted permission and notifying City staff prior to remediation operations. This excludes worker warning signs. 18. Provide and install a safety barrier during the remediation process to prevent entry to unauthorized personnel. The barrier must be an Orange Barricade fence supported by t-posts – Menards SKU 1719545 19. Excavate & back-fill ALL DRIP ZONE(S) MANUALLY. No heavy equipment shall be used on or near drip zones. 20. Install backfill in excavated areas within seven (7) days of excavation completion. Further, install sod or other specified ground cover within seven (7) days of backfill installation completion. Weather conditions will be monitored and noted if a time extension is necessary. 21. All backfill soil shall be properly compacted and areas near structures shall be sloped properly. Compaction shall be performed either mechanically or manually using a tool designed for “compaction”. All areas receiving sod shall have a finish grade surface immediately prior to sod installation. This includes hand raking and significant amounts of leaves and debris removed. 22. Adequately water all newly planted live materials for a minimum of 30 days following installation