Specifications include, but are not limited to: two laboratory renovations in basement room 008 and second floor room 234 of Barnard Hall, located on the property of Montana State University in Bozeman. It includes selective demolition of both rooms 008 and 234. Existing equipment and furnishings removed from room 008 and relocated to room 234 to be coordinated with the owner and the owner’s third-party movers. Accommodations to include any necessary transition period which would allow owner equipment relocation. In the basement room 008, a new opening will be created in an existing wall. The existing room 008 entrance door will be relocated. An existing fume hood will be removed from room 008 and relocated to room 008F and a new fume hood will be added to room 008. Work will include new ventilation and ductwork for both fume hoods connecting through first floor room 136 to the roof with roof mounted equipment. Work in room 008 includes new walls, new ceilings, new interior viewing windows and a new closet door and hardware. A new structural suspended ceiling grid with clean room ceiling tiles, suspended shelves and a laser curtain enclosure with attached track and laser curtain will be installed around the owner’s optic tables. Suspended shelves will be installed over the owner’s glove box train. New casework and counters will be installed in room 008 and 008D. A new sink will be added. New luminaires and under cabinet and under shelf lighting will be added to room 008. Work in room 234 will include new casework and counters. Under cabinet lighting will be installed in new casework. A shelf and thermostat will be relocated. Mechanical, electrical and plumbing services will be upgraded for new services and equipment in both rooms.