Specifications include, but are not limited to: 1 025323 1.000 LS MOBILIZATION / 2 025324 1.000 LS TRAFFIC CONTROL / 3 070580 1.000 HOUR $30.000 $30.000 FLAGGER (SET PRICE) / 4 025600 1.000 EACH FIELD OFFICE AND LABORATORY (TYPE A) / 5 020001 1.000 LS $4,000.000 $4,000.000 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / Section 01 Total $4,030.000 Section 02 ASPHALT SURFACE ITEMS 6 060241 4935.000 TON HMA OVERLAY (SR-12.5A) (PG 70-28) / 7 011372 1628.000 TON HMA-RCI (PG 70-28 RCI) / 8 081699 6563.000 TON QUALITY CONTROL TESTING (HMA) / 9 010819 56.000 TON EMULSIFIED ASPHALT (EMULSION BONDING LIQUID) / 10 011764 6577.000 SQYD MILLING / 11 080465 1.000 TON $250.000 $250.000 MATERIAL FOR HMA PATCHING (SET PRICE) / 12 000063 1.000 EACH $1.000 $1.000 ASPHALT AIR VOID PAY ADJUSTMENT / 13 000062 1.000 EACH $1.000 $1.000 ASPHALT DENSITY PAY ADJUSTMENT / 14 011750 1.000 EACH $50.000 $50.000 ASPHALT CORE (SET PRICE) / 15 081050 2553.000 TON PAVEMENT EDGE WEDGE (ROCK) / 16 011478 1.000 MGAL $40.000 $40.000 WATER (EARTHWORK COMPACTION) (SET PRICE) / 17 071992 89.800 STAL FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 FT.)) / 18 070923 179.500 STAL PAVEMENT MARKING (TEMP) 4" BROKEN (3')(TYPE II) /