Specifications include, but are not limited to: rehabilitating approximately 3,795 lineal feet of 21-inch diameter piping, 325 lineal feet of 30-inch diameter piping, 19 manholes, and all miscellaneous and incidental work on Lompa Lane. The Project also includes rehabilitating approximately 14 lineal feet of 8-inch diameter piping, 235 lineal feet of 6-inch diameter piping, 2 manholes, and all miscellaneous and incidental work on 5th Street south to 6th.; An additive alternate includes CIPP Lining of storm drainpipe on E. Washington Street of approximately 330 lineal feet of 60-inch circular CMP, 93 lineal feet of 72” Arch CMP pipeline, 2 storm drain manholes, and all miscellaneous and incidental work shown on the plans and described in the project specifications.