Due to the presence of installed bleachers in the gymnasium and time restraints, this project will be broken into two (2) phases. Phase 1 includes athletic wood flooring removal, abatement of polyurethane flooring (PMA), piers and poly fill in the center portion of the gymnasium to 16 feet from the exterior walls on both sides. New athletic flooring shall be provided and blended with the existing wood flooring. Painting of logos and lines are included in this phase of work. Phase 2 consists of the same work from 16 feet from the exterior walls to the exterior walls on both sides. The bleachers will need to be pulled away from the exterior walls approximately 20 feet by a licensed bleacher installer. The bleachers are installed as one piece and cannot be taken apart. The same repairs are to be completed to ensure levelness. Once work is completed, the bleachers will be moved back into position and reattached to the exterior walls. Bleachers should be inspected to ensure they are in proper working order prior to completion of the work. Phase 2 also requires painting lines on the floor to match existing striping. The timing of Phase 2 is currently anticipated to be scheduled for Spring Break 2025.