Specifications include, but are not limited to: 0010 104030010 MISCELLANEOUS WORK UNIT 10,000.00 0020 105070000 CONTRACTOR SURVEY AND LAYOUT LS 1.00 0030 109200005 MOBILIZATION LS 1.00 0040 208010000 BMP ADMINISTRATION-LS LS 1.00 0050 208010005 PAR BMP ADMINISTRATION-LS LS 1.00 0060 208010200 TEMPORARY EROSION CONTROL-FIXED UNIT 500.00 0070 401020155 COMMERCIAL MIX-3/8 IN-PG 58V-34 TON 3,054.00 0080 402020315 EMULSIFIED ASPHALT-TACK COAT GAL 1,606.00 0090 402020320 EMULSIFIED ASPHALT-FOG SEAL GAL 3,716.00 0100 402020377 SCRUB SEAL EMULSION TON 50.50 0110 409000000 FINAL SWEEP AND BROOM CRMI 2.90 0120 409000020 COVER-TYPE 2 SQYD 28,439.00 0130 411010000 COLD MILLING SQYD 32,066.00 0140 603014242 ADJUST VALVE BOX EACH 23.00 0150 604000100 ADJUST MANHOLE EACH 17.00 0160 606010385 REMOVE GUARDRAIL LNFT 100.00 0170 608010020 SIDEWALK-CONCRETE 4 IN SQYD 38.80 0180 608010125 DETEC WARNING DEVICES-TYPE 1 SQYD 2.90 0190 609010200 CURB AND GUTTER-CONC LNFT 66.10 0200 610100470 SODDING SQYD 9.00 0210 618030005 TRAFFIC CONTROL DEVICES CB UNIT 125,000.00 0220 619010062 SIGNS-ALUM SHEET INCR XI SQFT 142.00 0230 619010090 SIGNS-ALUM REFL SHEET XI SQFT 1,038.40 0240 619010230 REMOVE SIGN EACH 105.00 0250 619010240 REMOVE SIGN-GUIDE EACH 12.00 0260 619010340 POSTS-TUBULAR STEEL-SQ-PERF LB 328.00 0270 619010770 SQ TUBLR SLIP BASE BKWY-3 IN EACH 5.00 0280 620010301 CURB MARKING-YELLOW EPOXY GAL 86.00 0290 620011105 WORDS AND SYMBOLS-WHITE PAINT GAL 43.00 0300 620011110 WORDS AND SYMBOLS-YELLOW PAINT GAL 9.00