Specifications include, but are not limited to: STOCKPILE SITE: #1 PHILIPSBURG MAINTENANCE YARD ROUTE: MT-1 MILEPOST: 37.986 MMS STOCKPILE NUMBER: 011105 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 1,500 tons or 1,000 cubic yards of sanding material. Add 20% contractor furnished salt by weight to 1,500 tons of sanding material or add 20% contractor furnished salt by weight to 1,000 cubic yards of sanding material. Contractor is required to stockpile the blended material using a minimum 60’ contractor provided stacker belt. Place material in the storage shed. Stockpile material to facilitate water runoff. STOCKPILE SITE: #2 CLINTON MAINTENANCE YARD ROUTE: SEC-210 MILEPOST: 7.53 MMS STOCKPILE NUMBER: 011134 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 1,200 tons or 800 cubic yards of sanding material. Add 50% contractor furnished salt by weight to 1,200 tons of sanding material or add 50% contractor furnished salt by weight to 800 cubic yards of sanding material. Contractor is required to stockpile the blended material using a minimum 60’ contractor provided stacker belt. Stockpile material to facilitate water runoff. STOCKPILE SITE: #3 DRUMMOND MAINTENANCE YARD ROUTE: MT-1 MILEPOST: 62.76 MMS STOCKPILE NUMBER: 011103 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 2,100 tons or 1,400 cubic yards of sanding material. Add 50% contractor furnished salt by weight to 2,100 tons of sanding material or add 50% contractor furnished salt by weight to 1,400 cubic yards of sanding material. Contractor is required to stockpile the blended material using a minimum 60’ contractor provided stacker belt. Stockpile material to facilitate water runoff.