Specifications include, but are not limited to: A.The following asbestos-containing building materials must be removed prior to renovation activities: 1.12 Floor Tile & associated Black Mastic i.At designated locations, remove and dispose of asbestos-containing floor tile and black mastic. Approximately 7,500 square feet has been identified. Include removal and disposal up to an additional 10,000 square feet as an allowance for floor tile and mastic under carpet. Coordinate with Project Designer to confirm actual quantity of floor tile and mastic once carpet has been removed. A unit price per square foot shall be used for quantity allowance adjustment to contract. ii.The Abatement Contractor shall be responsible for removing and disposing of all carpet throughout building (all floors). iii.The Abatement Contractor shall be responsible for moving furnishings as needed to remove carpet, floor tile and mastic. The Abatement Contractor shall not be responsible for electrical disconnect or moving electronic equipment. iv.The Abatement Contractor shall remove vinyl cove base. Wood and terrazzo cove base shall not be removed. 2.Pipe Joint Compound i.Remove and dispose of approximately 30 fittings in the designated 1st floor area. ii.The Abatement Contractor shall remove pipe fittings that can be reached without demolishing solid walls or ceilings.