Specifications include, but are not limited to: This Agreement covers the maintenance of the area office roof as well as detached out buildings. Maintenance/inspection shall include the following: A. Remove all debris from roof surfaces, gutters, and downspouts. Immediately notify CHP Facilities Coordinator of all deficiencies. B. Inspect interior of building for signs of water penetration, frost build-up, and structural distress. The CHP on-site will walk the facility with Contractor. C. Inspect exterior of building for continuity of roof covering, deterioration of fascia, gutters, soffits, and performance of flashings. D. Remove accumulations of soil which may support plant life resulting in roof damage. E. Inspect condition of flat roof surface for blisters and ridges, splits or crack in the membrane, open end or lap joints in the cap sheet or membrane, exposed felts or deterioration of any component of the roof system. F. Inspect all walk pads for deterioration. G. Inspect for water ponding more than 72 hours after it rains which exceeds 1” in depth. H. Inspect all flashings and/or gravel stops for deterioration, lateral tears or splits, and opening joints...