Specifications include, but are not limited to: The Architect and Engineer will be responsible for providing comprehensive design services throughout each phase of the project. The Architect and Engineer’s scope of work shall include but not be limited to the following list of services: 4.1 Complete architectural and engineering servicesfor the design of the proposed facility and interface with existing site conditions. This is to include all necessary engineering disciplines, with the exception of Geotechnical, Environmental Engineering, and Commissioning Services. All consultants and/or engineers are to be contracted to the awarded architect/engineer company. The Owner shall have the right of refusal of any consultant. 4.2 Field verification of existing conditions. 4.3 Make presentations to explain the design of the Project to the Owner, Construction Manager, governmental authorities, or others as needed to perform the scope detailed below. 4.4 Building code compliance assessment. All work shall be completed in accordance with the applicable building codes and regulations of each authority having jurisdiction over the project. File documents for approval of governmental authorities having jurisdiction over the Project. Apply for and assist in obtaining the building permit along with any necessary variances. (Permit fees to be excluded). 4.5 Complete pre-design/programming validation phase. A pre-design phase review submission and review meeting, including a report identifying any deviations from the Owner's criteria, will be conducted. Assume at least weekly on-site meetings with the integrated project team during this phase. The architect/engineer shall be responsible for providing a design that is within the budget. Any value engineering or redesign required to meet the project budget shall be performed at no additional expense to the Owner. (Note: Construction Manager will prepare and provide cost estimates, Architect and Engineer shall participate as an integrated team member with estimate preparation and reviews.) 4.6 Complete a schematic design phase. A schematic design phase review submission and review meeting will be conducted. Assume at least weekly on-site meetings with the integrated project team during this phase. The architect/engineer shall be responsible for providing a design that is within the budget. Any value engineering or redesign required to meet the project budget shall be performed at no additional expense to the Owner...