Specifications include, but are not limited to: Modernize the HVAC systems within the Administrative Building at the facility. The project scope includes removing outdated equipment and its associated components from the Administration Building and replacing them with new equipment and its accompanying ductwork, piping, and accessories. Major components within the new systems include an air handler, variable air volume boxes, heat pump, air cooled condensing unit, hoods, booster coils, fans, dampers, air measuring stations, humidifier, and pumps. The new equipment will all be connected to a new centralized HVAC control system. To facilitate the HVAC work, the project scope includes removal and replacement of approximately 6,400 square feet of interior ceilings which will be replaced by a new ceiling system