Specifications include, but are not limited to: -The work to be performed at Maryland Parkway and Pyle Avenue includes construction of a horizontal elliptical reinforced concrete pipe (HERCP), storm drain manhole, connection to existing downstream concrete pipe, a drop inlet replacement, abandonment of an existing storm drain pipe, pavement removal and replacement, utility relocations, and pavement striping. -The work to be performed at Kentucky Avenue and Clark Street includes construction of a 28’L x 2’W trench drain, a horizontal elliptical reinforced concrete pipe (HERCP), storm drain manhole, construction of a drain headwall, pavement removal and replacement, pavement striping, utility relocations, valley gutter reconstruction, channel excavation, channel re profiling, and installation of a gravel mulch liner. The general location of this portion of work is Kentucky Avenue and Boulder Highway. -The work to be performed at Merrill Avenue and Tropicana Avenue includes asphalt replacement, curb and gutter replacement, installation of asphalt swale, valley gutter replacement, installation of 5’ U-channel, and landscaping restoration. -The work to be performed at Clayton Street and Sunrise Avenue is the construction of a storm drain system along Clayton Street and Park Avenue that consists of drop inlet, 18-inch RCP, excavation, manholes, reprofiling of the pavement, and other related items of work