Specifications include, but are not limited to: This work shall include furnishing all labor, material, and equipment to complete the project WATER SERVICE REPLACEMENTS – DEL PRADO as described in the specifications and shown in the plans. Work includes removals of existing 3/4”and 1” water services, relocation of existing service lines as needed to attain 4’ separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 68 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This work shall also include asphalt replacements