Specifications include, but are not limited to: Repair all cracks. Approximately 3,500 LF Hand grind out all existing patch work. Open up cracks with grinder. Fill cracks with epoxy. Touch up all surface after epoxy is applied for smooth finish. Smooth all areas with a hand grinder. All areas inside Skate Park that were sandblasted will need to be hand grinded smoothly for a clean, smooth finish. All areas of the Skate Park that are not suitable for a skateboard will be hand grinded. A detailed list of all products used in the repair of the Skate Park will be provided to the Town of Pahrump after the work is complete. Contractor to provide list to show the manufacturer and any other data or product that will allow the Town of Pahrump to match materials in the future.