Specifications include, but are not limited to: Project consists of Curb & Gutter replacement at various locations over the citywide as shown on the included aerial location maps. The intent of this project is to replace the curb and gutter with Combined Curb & Gutter (type varies) without damaging the existing adjacent and/or abutting sidewalks or drive approaches. Project may include additional work associated with or affected by the construction activities. The approximate quantities of the curb and gutter replacement project are: 1. Combined Curb & Gutter (type varies) 1043 L.F 2. 3’ Wide Concrete Valley Gutter 104.3 S.Y 3. Aggregate Base - AB-3 39.0 Ton 4. Asphalt Pavement Patching (2") 16.4 Ton 5. Seeding, Fertilizing and Mulch 0.1 AC 6. Traffic Control 1.0 LS