Specifications include, but are not limited to: 1. General Requirements: • Compliance with all local building codes and regulations. • Compliance with any architectural plans and engineering drawings. • Use of quality materials and workmanship throughout the project. • Adherence to construction schedule and deadlines. 2. Site Work: • Clearing and grading of the site for proper drainage. • Installation of temporary construction fencing. • Excavation for foundation and utilities. • Installation of drainage systems as required. 3. Foundation: • Concrete slab or foundation walls as specified in architectural plans. • Proper waterproofing and insulation. • Installation of anchor bolts for framing. 4. Framing: • Construction of walls, floors, and roof according to architectural plans. • Use of treated lumber for sill plates and exterior walls and any areas prone to moisture. • Installation of sheathing, house wrap, and flashing as required. • Proper bracing and reinforcement to meet structural requirements. • 6” plumbing walls where noted...