Specifications include, but are not limited to: 1. Prospective contractor shall perform the removal of existing Shingles and Felt, flashing around Dormers. And the removal of all debris from project site. 2. Prospective contractor shall be responsible for all safety barriers like orange construction fence to keep bystanders out of work areas and at a safe distance or equivalent. 3. Prospective contractor shall be responsible for any permits that maybe required. 4. Prospective contractor shall furnish all materials, tools and labor and equipment to remove all the shingles around (Approx. 19 ea.) Dormers down to the decking replacing any bad or rotten decking or lumber. 5. Prospective contractor shall install new moisture guard, step flashing and the corners. 6. Prospective contractor shall install (Tamko) moisture guard roofing underlayment and Certain Teed Grand Manor shingles or equivalent around dormers and missing roof shingles Approx. (1β056β sq. ft. ) of roof area. 7. Prospective contractor shall install ridge shingles above where the valley metal meets for a better seal. 8. The color of shingles shall best match existing (Weatherwood) 9. Prospective contractor shall nail the shingles with a minimum 1 ΒΌ" in length and a minimum four nails per shingle.