Specifications include, but are not limited to: NETC has obtained a new safety climb cable and two ladder sections from the tower manufacturer. The bidder must install the cable on the main and transition ladders. Bidder to install the ladder sections and associated hardware just below guy level 2. The ladder sections will need holes punched on the back side as needed for conduit U-bolts. There is coax attached to the ladder. Bidder must move coax to a position to allow for an unobstructed climb. This may involve using existing bracket hardware or installing new hardware and butterflies. If new hardware is used, remove old brackets from ladder. NETC has obtained new diagonal tower members and associated hardware from the tower manufacturer. The bidder must install the replacement diagonals at the following locations on the tower: one in section 10 B.2, one in section 15 B.1, one in section 17, B.3 and one in section 30 B.3. Bidder must remove wrap-lock at all diagonal intersection locations and replace with U-bolt assemblies that NETC has obtained from the tower manufacturer. While on site for diagonal replacements, begin treatment of 16 wires on workface, complete treatment of remaining 8 wires on back leg. Rust spots have been discovered at a few locations on the tower. Bidder must properly treat rust spots that have been identified. Bidder must patch and seal concrete guy anchors with grout as needed. In section 20 of the tower, the hoisting grip needs to be relocated from a ½” coax. Bidder must move this to a strut location and properly secure it...