Specifications include, but are not limited to: Approximately 1090 SqYd of Asphalt Pavement Removal, 5800 CuYd of Unclassified Excavation, 17900 CuYd of Borrow Excavation, 5400 CuYd of Subbase Course, 7300 SqYd of Geotextile Separator Fabric, 1200 CuYd of Aggregate Base Course, 1400 Ton of Asphalt Base / Surface Course, 92 Ton of Asphalt Binder (PG 64-34), 8 Ton of Emulsified Prime Coat, 3 Ton of Emulsified Tack Coat, 2900 Ft of 4” Underdrain, 2200 CuYd of Topsoiling, 18 Acre of Seeding and Fertilizing, 87100 SqYd of Mulching, Contractor Quality Control Program, Pavement Marking, Temporary Electrical Phasing Work, 5600 Ft of 1/C No. 8 AWG, 5kV, L824, Type C Cable, Installed in Conduit, 3900 Ft of 1/C No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Including Trenching or Plowing, Including Ground Rods, Connections & Terminations, 400 Ft of Remove and Dispose of Existing Conduit, 500 Ft of Remove and Salvage Existing Cable, 5000 Ft of Trenching & Backfilling or Plowing for Conduit, 4700 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type I, Sch. 40 PVC in Trench or SDR 13 HDPE Plowed, 70 Ft of Sand Encased, Electrical Conduit, 2-Way, 2-Inch Type III, Sch. 80 PVC in Trench, 260 Ft of Non-Encased, Electrical Conduit, 1-Way, 2-Inch, Type III, SDR 11 HDPE Bored, 5 Each of L-867B (12") Junction Box with Flat Steel Cover, 6 Each of Remove & Salvage for Reinstallation Existing L-861T LED Medium Intensity Taxiway Light, & Base Can, 2 Each of Remove & Salvage Existing L-858 Airport Sign, Remove & Dispose of Concrete & Junction Box, 9 Each of Remove & Salvage Existing L-853 Retroreflective Markers, 6 Each of Reinstall Existing L-861T LED Medium Intensity Taxiway Light & Base Can, 45 Each of L861T, 30-Inch Elevated, Class 2, Mode 1, LED, Medium Intensity Taxiway Light, Blue, Including Base Can, Airport Signs, Spare Parts, and other items of related Construction