Specifications include, but are not limited to: : Work to be performed under this Contract includes but is not limited to the construction of an aeration basin, final clarifier, and splitter box; equipment replacement, building modifications, site piping, structure demolition, underground piping, and all other Work required in accordance with the Contract Documents. Work is completed while maintaining plant operations and keeping the existing treatment plant in operation. This bidding period will include the following scopes of work: BP 2.1 Demolition – Entire Structure, BP 2.2 Demolition and Patching – Misc Structural, BP 3.01 Cast-In-Place Concrete, BP 3.02 Pre-cast Hollowcore, BP 4 Masonry, BP 5.1 Fabricated Metals – Supply, BP 5.2 Fabricated Metals Installation, BP 7.2 Div 7 EIFS – Furnish & Install, BP 7.3 Div 7 EPDM Roofing, BP 7.4 Div 7 Joint Sealants, BP 7.1 Div 8 Doors and Frames – Supply, BP 8.2 Access Doors – Supply, BP 8.3 Louvers – Supply, BP 8.4 Overhead Doors – Supply and Install, BP 9 Coatings, BP 10.1 Div 10 Specialties – Supply, BP 10.2 General Construction, BP 13 Wood Frame Building Systems, BP 31.01 Earthwork and Site Utilities, BP 31.02 Dewatering, BP 31.03 Temporary By-Pass Pumping, BP 32 Chain Link Fence and Gates, BP 40.1 Process Pipe – Furnish and Install, BP 46.9 Process Equipment and Gate – Install.