Specifications include, but are not limited to: 6.2.1 Examine the site prior to bidding on the project. The contractor’s failure to do so shall not become a basis for claim of additional monies or extension of time. 6.2.2 Secure all required permits and coordinate all necessary inspections. 6.2.3 Provide submittals for review and approval prior to starting work. 6.2.4 Remove all of the following from the site: A. Structures and footings B. Existing asphalt trails, concrete walks, and basketball courts C. Chain link fencing 6.2.5 Construct a bio-basin. All sewer work is to be done in this phase. 6.2.6 Furnish and install seed/sod/straw in the areas that are disturbed, using a seed mixture of 60 percent Fescue, 25 percent Bluegrass, 15 percent annual rye.