Specifications include, but are not limited to: Construct the SPLOST AREA 3 - CONNECTOR 3 SEWER EXTENSION as shown in the drawings and specifications. The project will consist of a 6” HDPE Sewer Forcemain extension from Shaw Industries plant 69 along Yeager Dr. 2,850 ft north crossing SR 3 (South Bypass) and onto Dug Gap Rd. Additionally a 6” HDPE Sewer Force main will be running east along an easement off of SR 3 for approximately 950 ft. The method of installing will be horizontal directional drilled. The project will consists of installation of pipe infrastructure, valves, flushing valves, installing future connections and boring casing pipe under SR 3 (S. Bypass), etc. The Contractor’s work also includes all erosion, sedimentation, and pollution control necessary for the project...