Specifications include, but are not limited to: The scope of work includes, but is not limited to, the following tasks: • Check and verify the provided equipment (tube settlers and aeration diffusers) are in compliance with the parts specified to be supplied in their provided submittal. • Install tube settlers in the two designated locations (basins) within the Marburg facility. • Install aeration diffusers in the three designated aeration tanka within the Marburg facility. • Perform any necessary modifications to the existing air piping system to ensure proper integration and operation of the new diffusers. • Test the installed equipment to ensure proper functionality. • Provide all necessary tools, labor, and materials for the installation, excluding the already purchased equipment.