PART 1: ALLEY RECONSTRUCTION PHASE 3 FROM MARKET ST. TO KAY ST. Item No. Approx. Quant. Unit Item Description 1 1 LS Site Clearing & Restoration 2 108 LF Remove Curb & Gutter 3 1 LS Seeding & Erosion Control 4 707 CY Unclassified Excavation 5 1 LS Traffic Control 6 519 SY 5” Reinforced Concrete Pavement 7 1,970 SY 6” Reinforced Concrete Pavement 8 37 LF Curb & Gutter 9 367 LF Curb & Gutter (Roll Type) 10 104 SY 5” Reinforced Valley Gutter 11 95 SY 6” Reinforced Concrete Driveway 12 318 SY 6” Rock Driveway 13 770 SY 5” Crushed Rock Base w/Geogrid 14 2 EA Manhole Adjustment PART 2: 2024 SIDEWALK PROJECTS Part A: Sidewalk Connections – Tall Tree Rd. from Buckner St. to Forest Park St. 15 798 SF Remove & Replace Valley Gutter 16 11 LF Remove & Replace Monolithic Curb 17 79 SF Remove Concrete Sidewalk 18 5,398 SF 4” Concrete Sidewalk (w/Fibermesh) 19 122 SF Truncated Dome Surfacing 20 94 LF Monolithic Edge Curb (Sidewalk) 21 1 LS Earthwork 22 1 LS Tree Removal & Stump/Root Grinding 23 1 LS Seeding/Sodding & Erosion Control 24 1 LS Site Clearing & Restoration Part B: Sidewalk Gap Infill – Glen Hills Dr. between Rock Rd. and Glen Hills Ct. 25 3,668 SF 4” Concrete Sidewalk (w/Fibermesh) 26 1 LS Earthwork 27 1 LS Seeding/Sodding & Erosion Control 28 1 LS Site Clearing & Restoration