This project includes furnishing of all materials, equipment, labor and means of construction necessary for the construction of the Dove Point Pump Station, 20-inch gravity sewer installation, fire station wet well conversion to a receiving manhole, Reunion pump station abandonment including site and yard piping modifications, modifications to the Mulberry Creek pump station including the installation of a vertical screen, removal of pumps with motors and installation of new dry pit submersible pumps, installation of a compressed air mixing system and spray water system in the wet well and installation of a new 16-inch HDPE and DIP force main and demolition of the surge tank along with site work. Modifications to the Crystal Farms pump station include installation of an insertion valve, construction of two (2) new valve vaults with interconnecting 12-inch DIP force main, new valve vault at HWY 53 and Howington Road. All work includes new electrical, and instrumentation as shown on the plans and specified.