Specifications include, but are not limited to: The HVAC Work called for in this bid includes all HVAC Work for the Project, inclusive of all HVAC required by Division 23-Heating, Ventilation, and Air Conditioning of the Project Specifications and by the Project Plans that are a part of the Contract Documents for the Project. The HVAC Work to be performed for the Project by the Contractor constitutes a portion of the overall Project, which includes the expansion and upgrading of existing restrooms, new storage, ticket sales booth, concession booth, new accessible stadium seating and handrails, demolition of existing press box, and construction of new press box with wheelchair lift for the Project at the Harry A. Burke High School Athletic Stadium, located at 12200 Burke St., Omaha, NE 68154.