Specifications include, but are not limited to: • Implement temporary traffic control and temporary pollution control measures • Implement Erosion and Sediment Control measures • Trim vegetation adjacent to and above the roadway related to contract operations • Pulverize approximately 9,609 square yards of existing roadway material to approximately 12” below existing surface. • Pulverize approximately 7,336 square yards of existing roadway material to approximately 15” below existing surface. • After initial pulverization remove / haul off approximately 665 yards of base materials to prep for cement treatment. • Preparation of new cement treated base to be approximately 12” thick after compaction. • Mix approximately 260 Tons of cementitious material and 273 Tons of Saturated-surfacedry (SSD) sand with the pulverized material. • Place approximately 15.6 Tons of asphalt cement curing seal on the reclaimed base. • Place approximately 2,771 Tons of Level 2, ½” Dense ACP. • Place approximately 361 Tons of ¾”-0” aggregate for roadside shoulders • Replace pavement markings and markers as required • Adjust utility cans / monuments as needed • Any and additional work called out by the Specifications • The County will obtain the road closure permit.