Specifications include, but are not limited to: Room 0052 (no work in 0052A) - Disconnect existing icemaker and connect new ownerprovided icemaker / Patch and paint all walls/ Install four dedicated 120V, 20A emergency receptacles/ Replace two existing ceiling lights with LED / Replace two existing specimen room lights, remove timer and install single pole switch/ Prep floor and install new welded seam flooring with integral 6" base. Room 0053 - Remove upper and lower cabinets and countertop on left side of entry door / Leave existing isoduct in place / Demo partial wall, demo 3-way switch and power from partial wall, patch the remaining wall and repair the ceiling where the wall was removed / Install new isoduct with emergency power for 2 incubator and 3 circuits / Add badge reader and electric strike to entry door / Patch and paint all walls / Demo all flooring and base and install welded seam flooring with integral 6" base/ Replace four existing lights with dimmable LED fixtures wiring and dimmer, verify that they are on emergency power/ Install new drop door sweep on entry door. Room 0054 - Remove cabinets and countertops on the right side of the entry door/ Demo cup sinks and all med gas turrets, cap plumbing at wall / Demo outlet strip on left side and replace with two channel isoduct, add three dedicated 120V, 20A emergency receptacles / Replace eyewash / Add badge reader and electric strike to entry door/ Install new drop door sweep on entry door / Remove the lockset and permanently lock the door to room 0055, seal it off with drywall on one side / Patch and paint all walls / Demo all flooring and base and install welded seam flooring with integral 6" base/ Replace five existing lights with LED / Install new drop door sweep on entry door.