Specifications include, but are not limited to: Project consists of the installation of new membrane roofing systems over existing roofs. 1. Building 100: Install self-adhering TPO roof system + ¼” gypsum cover board + 2” thick rigid iso insulation board + ¾” PT CDX plywood roof decking installed over existing EPDM rubber roof system adhered to gypsum cover board over OSB roof decking. Remove existing exterior parapet walls and metal roof panel mansard fascia. Remove existing roof drains. Install new wood framing to raise existing parapet walls on top of marriage truss parapets. 2. Bldgs 200, 300: Install TPO metal retrofit roof system RhinoBond attachment method over existing Type R metal roof panels (exposed fasteners). Install TPO membrane over ¼” gypsum cover board over 1 ½” rigid iso insulation board + EPS rigid flute fill insulation board. G. Construction Contract: Bids will be received for the following Work: 1. General Contract (all trades).