Specifications include, but are not limited to: Demolition – The Proposer will be responsible for demolition, removal, and loading of the structure, concrete foundation, and all contents of the structures, and pool. The County will be responsible for all costs of transport and proper disposal of all demolition debris. Certifications and permits – The Proposer will be responsible for following Georgia state law. Any applicable permitting fees normally issued by the County may be waived but obtaining the permit(s) may still be required, at the discretion of the County. Utility Locates and Disconnects – The proposer will be responsible for coordinating and ensuring utility locates and disconnects. Reuse of Materials – Brick and masonry may be reused by the County. Brick and masonry are to be sorted separately from other materials. Salvage of Materials – Unless referenced otherwise in an Addendum, the County shall take ownership and responsibility of all scrap/salvage materials. Extent of Underground Demolition – The swimming pool is constructed of gunite. The gunite material must be removed. Responsibility for Temporary Facilities – The Proposer will be responsible for all temporary facilities necessary to successfully complete the project. Storm Water Containment- Storm water best management practices must be implemented. Safety- The Proposer shall comply with safety rules and regulations pertaining to the activity, and shall govern employees according to, and in compliance with the applicable OSHA Regulations. Precautions and safety measures shall be provided for the safety of all workers. The Proposer shall maintain an accurate record of exposure data on all accidents incidental to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to property, materials, supplies, or equipment. Proposer shall provide information describing the specific safety measures/plans to be used in this project to protect personnel, public, structures and infrastructure. Proposal must include any/all fees related to this requirement. Hazardous Materials – None on site.