Specifications include, but are not limited to: A. Renovations and new field construction at the City’s Recreation Complex (1524 Broadway St) a. Stormwater study, and if needed, stormwater retention b. Construction of a minimum of two (2) additional 14U baseball/softball fields c. Construction of a two (2) football/soccer (mix use) fields d. Renovation of existing south baseball field e. Installation of pickleball/mixed use sports court f. Update/Renovation of the concession and restroom facility g. A.D.A compliance h. Athletic field light study and installation of new lighting i. Demolition and/or relocation of existing components, as needed, to complete the project j. Completed A.D.A parking lot, landscaping, and signage B. Complete Renovation to the City Park (Harper Street/N Randolph Street) a. Stormwater study, and if needed, stormwater retention b. All new inclusive playground equipment and play features c. Construction of new shelter/pavilion and restroom facilities d. Water play feature e. Replace existing tennis court/pickleball surface i. Install new lighting and fencing f. Walking path g. Completed A.D.A parking lot, landscaping, and signage C. Add Alternate ** City Lake – 16100 S Lake Rd a. New playground equipment and inclusive natural play b. Pavilion c. Restroom / Bathhouse facility with storm shelter