a. Clearing of Routes. The selected Bidder ("Contractor")will, when directed by the City, cause its personnel and equipment to travel and operate along, and plow ice and snow accumulations from the entire length of the City's snow plow routes (each, a "Pass"}, which snow plow routes are depicted on Exhibit A to the Contract/Proposal (each, a "Route" and collectively, the "Routes"), all in accordance with the requirements of the Contract/Proposal and these Special Provisions. Each Pass on each Route will be deemed completed when: (i) the Contractor's personnel and equipment have traveled the entire Route; (ii) in the course of traveling the Route, the Contractor's personnel and equipment have plowed snow and ice accumulations within the Route of from curb to curb; and (iii) the City has determined that the Work complies with the requirements of the Contract/Proposal and these Special Provisions and has accepted the Work in writing. The City may direct the Contractor to perform and complete multiple Passes of the same Route or Routes during a given snow event, but the Contractor will not begin any Pass without prior authorization by the City. b. Clearing of Other Locations. The selected Bidder also will, at the direction of the City, plow ice and snow accumulations from paved surfaces at locations within the City other than the Routes ("Additional locations''), all in accordance with the requirements of the Contract/Proposal and these Special Provisions. The Work at the Additional Locations will be deemed completed when: (i) the selected Bidder has plowed snow and ice accumulations from each paved surface within the Additional Locations from curb to curb; and (ii) the City has determined that the Work at the Additional Locations complies with the requirements of the Contract/Proposal and these Special Provisions and has accepted such Work in writing. c. City Owned & Pervious Alley Routes. The selected Bidder also will, at the direction of the City, plow snow and ice accumulations from paved surfaces at locations within the City other than the Routes (“City Owned & Pervious Alleys”) Exhibit F, all in accordance with the requirements of the Contract/Proposal and these Special Provisions. Only a rubber or composite blade may be used on the Pervious Alley Locations. No metal blades are to be used. The Work at the City Owned & Pervious Alley Locations will be deemed completed when: (i) the selected Bidder has plowed snow and ice accumulations from each paved surface within the Additional Locations from curb to curb; and (ii) the City has determined that the Work at the Pervious Alley Locations complies with the requirements of the Contract/Proposal and these Special Provisions and has accepted such Work in writing. d. Salt Application Excluded. The Contractor will NOT be responsible for the application of salt or any other material or treatment to any of the paved surfaces within the Routes or the Additional Locations. The Work only includes plowing and removal of ice and snow from the Routes and any Additional Locations.