Specifications include, but are not limited to: The contractor shall: • Complete the quarterly mechanical inspections. Inspecting for worn, failed or doubtful parts; wiring; mountings; drive couplings; sheaves; pulleys; heat exchangers; oil level; rotation; soot; flame composition and shape; pilot and igniter; steam, water, oil and/or refrigerant leaks, etc. Testing for excessive vibration; motor winding resistance; refrigerant charge; fan RPM; refrigerant oil(acid); flue gas analysis; safety controls; combustion and draft; crankcase heaters; control system(s), etc. • Flush heat exchangers at the Aquatic Park once a year. • Replace shaft seals on the circulation pumps every other year at the Aquatic Park. • Provide all labor (Regular, Shift, OT, DT & Holiday) to complete service inspections, maintenance & repairs. Maintenance to be scheduled M-F 7am-4pm • After hours emergency calls are covered under Scope A for equipment identified on the equipment list.