The CITY has received East-West Gateway TAP funds for design, right-of-way and construction of the Spencer Road multi-use path from City Centre Park and Mexico Road to Spencer Road and Executive Centre Parkway. Consistent with the approved project application, the primary goals of the project are: 1. Upgrade the bicycle/pedestrian crossing on the east leg of the Mexico Rd at City Centre Park signalized intersection to accommodate a 10’ wide multi-use path that meets current ADA standards. 2. Remove the existing sidewalk along the north side of Mexico Rd and replace with a 10’ wide multi-use path that meets current ADA standards, tying into the existing path near 5770 Mexico Rd. 3. Install a new 10’ wide multi-use path along Spencer Creek tying into the north end of the existing multi-use path previously constructed by the City’s Parks Department, extending north to Executive Centre Pkwy. 4. Remove existing sidewalk along the south side of Executive Centre Pkwy and replace with a 10’ wide path that meets current ADA standards from east of the Spencer Creek bridge to the southeast corner of the Spencer Rd and Executive Centre Pkwy. 5. Remove existing medians to the east and west of the Spencer Creek bridge to shift the eastbound lane into the existing unused median area. 6. Remove the existing barrier wall on the Spencer Creek Bridge and install a new barrier wall approximately 6’ north to provide a 10’ wide multi-use path across the south side of the bridge. 7. Upgrade the southeast corner of the Spencer Rd and Executive Centre Pkwy intersection to accommodate the 10' wide multi-use path and to meet current ADA standards. 8. Remove and replace existing traffic signal pedestrian equipment for the multi-use path with ADA compliant pedestrian signal equipment. 9. Upgrade the bicycle/pedestrian crossing on the east leg of the Executive Centre Pkwy at Spencer Rd intersection to accommodate a 10’ wide multi-use path that meets current ADA standards. 10. Replace all guardrail and chain link fence for the Spencer Creek Bridge on Executive Centre Pkwy. 11. Install epoxy polymer overlay on entire bridge deck, including the multi-use path surface, and bottom 1/3 of bridge barrier.