Specifications include, but are not limited to: The Contractor shall provide semi-annual maintenance services as follows: a. Ensure all preventive maintenance inspections comply with the manufacturer’s recommendations. b. Remove all debris and dispose of offsite. c. Notify the CHP on-site contact of any deficiencies in a timely manner. d. All quotations for additional services not covered under this Agreement are to be provided to the state at no cost by Contractor. FIRST SEMI-ANNUAL MAINTENANCE a. Inspect lifting chains and components for deformation, wear, or corrosion. b. Inspect all hydraulic components for leaks, deformation, wear or corrosion. c. Tighten all fasteners and hydraulic fittings as required. d. Ensure all O-rings, boss fittings, and jam nuts are tightened to 15-foot pounds. e. Remove, reseal, and reinstall any pipe fittings that are leaking. Use UNYTE Thread Sealant or equivalent on fitting threads. f. Inspect anchor conditions for any possible corrosion and inspect the concrete floor for any signs of fatigue or fractures. g. Wipe cylinders, wiper seals, and the base of each post to remove any weeping oil and dust. h. Verify fluid level and fill if needed with manufacturer’s recommended fluid. i. Lubricate the arm restraint assemblies to insure free and smooth operation. j. Cycle unit to full height and bleed approximately 30 seconds. SECOND SEMI-ANNUAL MAINTENANCE a. Inspect all hydraulic components for leaks, deformation, wear or corrosion. b. Tighten all fasteners and hydraulic fittings as required. c. Ensure all O-Rings, boss fittings, and jam nuts are tightened to 15-foot pounds. d. Remove, reseal, and reinstall any pipe fittings that are leaking. Use UNYTE Thread Sealant or equivalent on fitting threads.