The project consists of excavating and restacking rip rap (rip rap shall be a minimum of 4’ below the bottom of the channel). Building an uphill retaining wall prior to Spigel Road. Ditch, shoulder/uphill slope cleaning (finished ditches should be 3’ wide by 2’ deep), seed and mulching/hydroseed ditches and all areas that are not stone lined and that have soil that has been disturbed and graveling the road surface. There are 2 marked locations on Stony and 5 marked locations on Fletcher. The contractor is responsible for all materials needed for the project. All work will be under the supervision of the Town of Stockbridge Road Foreman. The contractor must work with and follow the requirements of the Vermont ANR River Management Engineer. The contractor will give a copy of all invoices for materials to the town to show the yardage or LF used on the project. No changes shall be made to this agreement unless done in writing and approved by both the town and the contractor. The Town of Stockbridge has the right to reject any and all Bids.