- Reclaim refrigerant from existing chillers; owner will keep all reclaimed refrigerant. - Disconnect and remove and existing (2) Trane Chillers, (2) primary chilled water pumps and (2) secondary chilled water pumps - Furnish and install Two new Trane RTAF350E Trane Chillers. o Provide communication card to integrate to ALC o Dual point electrical connection o Efficiency ratings equal to the selections attached o Acoustic ratings equal to or better than attached o Chiller must be able to deliver chilled water with +/- 0.5 chilled water set point accuracy - Make all necessary piping modifications for new chillers. - Make all necessary electrical modifications for new chillers. - Furnish and install new like Primary and secondary pumps. o Provide new Triple duty valve, isolation valves and suction diffusers. o Provide (2) Primary pumps ABB VFDs o Provide (2) Secondary Pumps ABB VFDs - Make all necessary piping modifications for new Pumps. - Make all necessary electrical modifications for new pumps. - Furnish and install new Heat Trace on outdoor piping. - Insulate all new piping to match existing. - Test and balance Hydronic system. - Provide Complete operational startup and system checkout.