Specifications include, but are not limited to: The Project includes the following Work: • Installation of approximately 2,670 linear feet (LF) of gravity sewer pipe in various diameters: - 8-inch diameter pipe - 12-inch diameter pipe - 15-inch diameter pipe • Construction of 14 precast concrete manholes. • Installation of a 24-inch steel casing using jack and bore method to cross under the Georgia Department of Transportation (GDOT) right-of-way without disrupting traffic. • Demolition of two existing lift stations • Removal and replacement of existing pavement sections impacted by construction activities. • Installation of a new asphaltic concrete overlay along Ramble Road. • Installation of three grinder pump systems to collect wastewater from areas with limited gravity flow. • Installation of approximately 400 LF of 2-inch diameter low-pressure force main to convey wastewater from the grinder pumps to the gravity sewer system. • Miscellaneous task such as excavation, backfilling, traffic control, and any other necessary work to complete the project.