The project generally consists of the following (the Work): 1. Install, maintain, and remove temporary traffic control and erosion control measures. 2. Install approximately 200 LF of 8-inch, 6-inch and 4-inch ductile iron water main with appurtenances. 3. Connect to 6 existing water service, 1 existing hydrants. 4. Abandon existing water system components. 5. Remove and replace 10 LF concrete curb, 252 LF of concrete curb and gutter, 6. Remove and replace 1060 SF of concrete driveway. 7. Reconstruct approximately 9,317 SF of roadway including ACP and Base Rock. 8. Perform additional and incidental Work as called for by the Specifications and Plans. 9. Coordinate work with proposed utility relocation by franchise utility companies