• Saw-cutting and removal of existing pavements, sidewalks, and curb and gutter with proper disposal off-site. • Removal and proper disposal or storage of unleaded and diesel fuel from existing underground fuel storage tanks. • Removal and proper disposal of underground fuel storage tanks. • Removal and proper disposal of fuel pumping equipment. • Relocation of existing power poles, power lines, and underground utilities indicated. • Relocation of existing curb cut on Parkway Boulevard. • Installation of new underground storage tanks and fuel pumping equipment. • New pavement, sidewalk, and curb and gutter to replace existing. • Installation of backup generator. • Repair of irrigation system (as disturbed by work) and landscaping. • Electrical and mechanical work as described on Construction Documents.