The Project is located at multiple intersections along Crestview Dr. In general, the work to be performed consists of asphalt concrete removal and installation, concrete median installation, concrete bulb-out installation, concrete traffic circle, ADA ramp construction, PCC curb & gutter removal and replacement, PCC sidewalk removal and replacement, rectangular rapid flash beacon (RRFB) installation, striping removal and replacement, install storm drain pipes and storm drain structures, mobilization, traffic control and construction signage, storm water pollution control, dust prevention and control, site cleanup, and all other work as shown on the Plans and as called for in the Specifications and as directed by the Engineer.