Specifications include, but are not limited to: Lobitos Water Project (see map, Section E, “Project Scope Documents,” Attachment B). Development of water infrastructure at the Bluebrush Canyon and Elkus/Lobitos Grazing Units in Purisima Creek Redwoods Open Space Preserve, which includes: development of one (1) spring, installation of six (6) 4,999-gallon HDPE water storage tanks and associated pads/plumbing/fittings, installation at two (2) sites of solar pumps and supportive solar/electrical equipment, installation of six (6) concrete stock troughs and associated pads/plumbing/fittings, and installation of 1” HDPE pipe, plumbing, and fittings. All infrastructure must be installed according to Natural Resources Conservation Service specifications, found under Section E, “Project Scope Documents,” Attachment A, unless otherwise authorized by District representative. In total, project requires the following elements: ~14,500 linear feet of 1” HDPE pipe (DR11) Six (6) concrete stock troughs Six (6) 4,999-gallon HDPE water storage tanks Two (2) solar pumps and associated solar infrastructure Re-develop one (1) spring...