Specifications include, but are not limited to: Contractor is responsible for the demolition and proper disposal of all items necessary to fully complete the remodel project. Items include, but not limited to: carpet, cove base, ceiling tiles and grid, lighting fixtures, HVAC grills and ducting, and sheetrock. An asbestos survey from Jackson County’s consultant will be available prior to project starting, at this time, no asbestos containing materials are anticipated to be present within the project boundaries. Contractor should notify project manager immediately should a material suspected of containing asbestos be discovered during construction. New Items: General Contractor is responsible for providing materials and labor to fully complete the remodel as described in ORW documents and DB scope. Items include but not limited to: Carpet flooring, cove base, metal studs, sound insulation, sheet rock, doors (jambs, hardware, glass, etc.), window glass and frames, ceiling grid and acoustic tiles, light fixtures, power outlets, switches and controls (if required by code), data outlets, patch panel and CAT6 wire, paint, fire alarm system items if required by code, HVAC ducting, VAVs (VAV units, electrical and integration into DDC system) and incidentals...