Work of the Project includes selective renovation of the existing 16,923 +/- GSF, two story Boone National Guard G1 building including reconfiguration of interior spaces with new metal stud and gypsum wallboard assemblies; removal of, storing and reinstallation of existing modular offices, cubicles and furniture; removal of and replacement of existing lock cores and select hardware; replacement of select doors and hardware; installation of new doors and hardware; interior renovation of all restrooms including replacement of all plumbing fixtures, demo of existing ceramic floor tile and wall tile, installation of new epoxy resinous flooring, new cast terrazzo shower bases, new wall tile, new lockers, new toilet partitions and toilet accessories. Additional interior finishes include carpet tile; LVT flooring; painting of walls, ceilings, exposed roof deck, structure, and other items exposed to view. The work also includes renovation/replacement of selective portions of existing plumbing, HVAC and electrical systems including complete lighting replacement.