Specifications include, but are not limited to: a. District work phase kick-off meeting and develop agreed upon Project expectations, goals, and objectives. b. Services to be performed per the locations and HVAC quantities set forth in Exhibit A. c. Verification of ventilation rates in all occupied areas to determine whether they meet the minimum ventilation requirements set forth in Table 120.1-A of Part 6 of Title 24 California Code of Regulations. d. Calculation of the required minimum outside air ventilation rates for each occupied area based on the anticipated occupancy and the minimum required ventilation rate per occupant set forth in Table 120.1-A. e. Measurement of outside air and verify if the system meets the minimum outside air requirement in accordance with form CEC form CEC-NRCA-MCH-02-AOutdoor Air Acceptance Section B. f. Measurement of inlet and outlet ventilation rates. Verification that inlets and outlets are balanced within tolerance (+/-10%) of system design or calculated values. g. Verification that a positive pressure differential exists relative to the outdoors and ensure that the building is not over-pressurized. h. Verification of coil velocities and discharge air temperatures meet manufacturer specifications (or are within generally accepted HVAC industry values if specifications are not available). i. Verification that separation between outdoor air intakes and exhaust discharge outlets meet requirements of the California Building Code, including Section 120.1...