Specifications include, but are not limited to: 1. Remove existing asphalt and basketball goals. 2. Add 6” HDPE perforated underdrain around the perimeter of the court to help with drainage. The pipes shall outlet into the slope on the southwest side of the courts. Diagrams listed as Attachment B. 3. Provide 6” of stone base. Contractor shall verify base materials and if less than 6” exist material shall be brought in to have a 6” minimum base. 4. Fill visible low areas and lower visible high spots. Ensure a slight .5% slope water doesn’t pond on the court. 5. Shore up base as needed, before paving 2.5” in two lifts, 1.5” of 9.5mm surf CRS and 1” of 4.75mm Surf CRS of asphalt. 6. The basketball court is approximately 94’ x 98’ (courts are not regulation size.). New asphalt must cure for 30 days prior to color surface application. 7. Apply 2 coat(s) of California Products Acrylic Resurfacer (or similar product) to subject courts...