Specifications include, but are not limited to: Turnkey construction of an approximately 10,000 SF addition of a second recreational gymnasium area with site work included (includes Arch, Structural, and MEP design): The existing gym is 96’x80’ and is striped for a high school regulation full court (actually, it is 3’ short of regulation size), 2 half basketball courts with practice goals on the sides, 3 pickleball courts and 2 volleyball courts. There are bleachers along one side. The project is to duplicate this gym along the south side of the existing facility, albeit slightly larger to accommodate telescoping bleachers on both sides of the court. The new gymnasium is to have windows along the south wall along the upper portion of the wall, six (6) retractable basketball goals, and two (2) scoreboards. Interior metal wall panels to protect insulation. R-30 insulation in the roofline, R-19 in the walls. Painting of exposed metal building system and fire sprinkler piping. Electrical to include new exterior wall packs, AVG of 30-foot candles in gymnasium, emergency exit lights, lighting control devices, power to scoreboard, power to two (2) interior ceiling hung speakers, power to location to control scoreboard and speakers, duplex outlets per code, power to HVAC equipment, fire alarm. HVAC system to include two (2) 20-ton units and duct sock for air distribution. Access to the new gym will be through the current exterior wall on the south side of the building. Relocation of the gravel access road to the rear of the existing building will be required by moving it south...